PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavating for foundation walls along column line 6.5 from G-C.7 Facing South-East (800x600).jpg Installing Metal decking at Derrick -2 Facing South (800x600).jpg Installing Metal decking at Derrick -2 Facing South-West (800x600).jpg Welding Derrick -2 Facing North-East (800x600).jpg Core Drilling for Conduit Facing West (800x600).jpg
Next page Excavating for foundation walls along column line 6.5 from G-C.7 Facing South-East (800x600)
Excavating for foundation walls along column line 6.5 from G-C.7 Facing South-East (800x600)